Kingman Liner repair 2010
This major lateral diverts over 100 cfs to the Adrian , Oregon area. It is the fist lateral off of the North canal. This lined section of canal is a rocky high bank above the Owyhee river.
The lined section of canal had deteriorated in 75 years and risked failure. This repair project took place 2009-2010.